Canada Projects Review

Source data

Gordie Howe International Bridge crossing components

Sources checked

Follow the crossing between Windsor and MichiganGordie Howe International Bridge crossing components
  1. 01
    Canadian port of entry

    Approximately 53 hectares · Canadian inspection, toll and related site functions Source 1

  2. 02
    Bridge

    Approximately 2.5 kilometres with an 853-metre main span · Six road lanes and a shared walking and cycling path Source 2

  3. 03
    US port of entry

    Approximately 68 hectares · US inbound and outbound border inspection facilities Source 1

  4. 04
    Michigan I-75 interchange

    Approximately 3 kilometres of I-75 modifications · Connects the US port of entry and interstate network Source 1

  5. 05
    Canadian primary inspection lanes

    24 configurable lanes · Supports up to 16 commercial or 19 traveller lanes, depending on configuration Source 4

The route includes customs facilities on each side as well as the bridge deck.

Source 1 Source 2 Source 3 Source 4

Gordie Howe International Bridge crossing components

Facility areas and dimensions are published project figures. Border inspection lane configurations are maximums in different operating setups.

5 records
Source
Canadian port of entryApproximately 53 hectaresCanadian inspection, toll and related site functionsSource 1
BridgeApproximately 2.5 kilometres with an 853-metre main spanSix road lanes and a shared walking and cycling pathSource 2
US port of entryApproximately 68 hectaresUS inbound and outbound border inspection facilitiesSource 1
Michigan I-75 interchangeApproximately 3 kilometres of I-75 modificationsConnects the US port of entry and interstate networkSource 1
Canadian primary inspection lanes24 configurable lanesSupports up to 16 commercial or 19 traveller lanes, depending on configurationSource 4

Source links